$12M2018 to 2020
Ethane export pipeline, Qatar Shell GTL
E&I Project Manager, Black Cat Engineering & Construction; EPCM Worley. Electrical and instrumentation for a 20-inch pipeline exporting ethane to the Qatar Energy grid at RLIC A-21: cathodic protection, ESD valves, pressure transmitters, fire and gas detectors, control valves, cable management, vendor management.
Installed and commissioned.
20-person crew2016 to 2017
Flare Closed Drain, Qatar Shell GTL
Lead Electrical Engineer, Black Cat; EPCM Chiyoda. Electrical scope of a new liquid KO vessel to stop overfill from wax vessels into the main flare header: equipment sizing, material approvals, feeder modules for two pump motors, trays, heat tracing, earthing, lighting. 20 technicians, a technologist and an engineer.
Energised and commissioned with the client's commissioning team.
$14M2012 to 2013
Ammonia recovery and flare system, QAFCO
E&I Project Manager, Black Cat (EPCC, contract 702489). Final design, procurement, construction, start-up and commissioning of two flares in the Ammonia-1 and Ammonia-2 plants, Mesaieed.
Two flares commissioned.
$3M2013 to 2015
Continuous emission monitoring, Qatar Petroleum
Construction Manager, Black Cat (EPIC, contract GC11114300). Engineering, procurement, installation, start-up and commissioning of CEMS shelters on selected combustion sources at the NGL-1 and NGL-3 plants, Mesaieed.
Shelters commissioned on both plants.
105.5 MW2009 to 2012
New Doha International Airport, CP60 utility plants
Field Engineer, C.A.T. Group. $241M design, procurement, construction, start-up and commissioning of three central utility plants: 16 water-cooled chillers and cooling towers at 38,000 TR, 20 standby generators at 105.5 MW.
Plants commissioned for airport opening.
$331.5M2007 to 2008
Porto Arabia, The Pearl-Qatar
Electrical Engineer, C.A.T. Group; client UDC, engineer Dar Al-Handasah. 85,807 m² townhouses, 88,028 m² retail, 60,223 m² parking. Shop drawings to Kahramaa regulations for power, lighting, fire alarm, BMS, data and home automation; voltage drop, LV schematics, load schedules, BOQ, O&M manuals.
Value-engineering package: MV panels from Form 4 type 6 to Form 3b, PVC outlet boxes, standard breakers in place of motorised, DOL starters for motors up to 15 HP.
8 flow meters2018
Ultrasonic flow metering, Qatar Shell GTL
Electrical Project Manager, Black Cat; EPCM WorleyParsons. Clamp-on sensors and transmitters with stanchions, sunshades, trays and cabling; terminations from sensors to transmitters, junction boxes and the Field Auxiliary Room.
Installed and terminated in two months.